info@jointwings.com +965-65723333
Installation of CP system @ Shuaiba Oil Pier – KNPC: (2011)

Installation of CP system @ Shuaiba Oil Pier – KNPC: (2011)

– Installing of 191 Reference Etrodes & Anodes.
– Post Survey (using UW Digital Camera).
– Project was completed successfully before the planned deadline.

Leave a Reply

Your email address will not be published. Required fields are marked *