
Installation of CP system @ Shuaiba Oil Pier – KNPC: (2011)
– Installing of 191 Reference Etrodes & Anodes.
– Post Survey (using UW Digital Camera).
– Project was completed successfully before the planned deadline.
-
Client
HIESCO -
Date
2011 -
Category
مشاريع ذات صلة

Single Point Mooring (SPM) routine maintenance (KOC): (2009)
Projects We Made

إنجاز أعمال القطع تحت الماء سنة 2017 /2/5 الموقع الجزيرة الصناعية التابع للمصفاة الرابعة على عمق 23 متر
Projects We Made

Underwater recovery and salvaging: (2010)
Projects We Made

Underwater Survey & marine growth cleaning using special jet system: (2009 To present)
Projects We Made

Protection of MAB submarine pipelines (KNPC): (2008)
Projects We Made