Single Point Mooring (SPM) routine maintenance (KOC): (2009)
– Actuator Proximity switches removal and installation. (for calibration)
– Proximity switches testing.
– Main 56″ Valve opening and closing.
– Pipeline venting prior to commissioning.
– Wellhead Leak checks. (Including mooring, floating and under Buoy hose system and a Pipeline End Manifold (PLEM)).
-