
Underwater recovery and salvaging: (2010)
– (24m) Length Tug Boat recovered from 16m depth.
– (110m) Length Cargo ship inspection prior to recovery.
-
Category
Related Projects

Protection of MAB submarine pipelines (KNPC): (2008)
Projects We Made

Single Point Mooring (SPM) routine maintenance (KOC): (2009)
Projects We Made

Installation of CP system @ Shuaiba Oil Pier – KNPC: (2011)
Projects We Made

Underwater Survey & marine growth cleaning using special jet system: (2009 To present)
Projects We Made

Completion of underwater cutting works in 2017/2/5 The site of the industrial island of the fourth refinery at a depth of 23 meters
Projects We Made
Leave a Reply