Protection of MAB submarine pipelines (KNPC): (2008)
– Through all project planning. (method of dumping, quantities, timing, organization) – Pre survey on […]
View Details -
Single Point Mooring (SPM) routine maintenance (KOC): (2009)
– Actuator Proximity switches removal and installation. (for calibration) – Proximity switches testing. – Main […]
View Details -
Installation of CP system @ Shuaiba Oil Pier – KNPC: (2011)
– Installing of 191 Reference Etrodes & Anodes. – Post Survey (using UW Digital Camera). […]
View Details -
Underwater recovery and salvaging: (2010)
– (24m) Length Tug Boat recovered from 16m depth. – (110m) Length Cargo ship inspection […]
View Details -
Underwater Survey & marine growth cleaning using special jet system: (2009 To present)
– Al bahsa4 Hull cleaning (100m length). – Fishing Boat Hull cleaning (24m L) United […]
View Details -
Completion of underwater cutting works in 2017/2/5 The site of the industrial island of the fourth refinery at a depth of 23 meters
Completion of underwater cutting works 2017/2/5 The industrial island site of the fourth refinery at […]
View Details